COMPLETED PROJECTS
North Yard 250’ Guyed Tower
for BNSF Railroad:
The tower failed under the requirements of EIA/TIA
222-G. A PE certified engineering solution was designed to remediate the
tower. The tower modifications included: Replacement of existing guy cables at
all levels and new horizontal and diagonal braces were added from 180’ to 210’
levels.
North Yard 80’ Self-Support Tower
for BNSF Railroad:
The tower failed under the requirements of EIA/TIA 222-G.
A PE certified engineering solution was designed to remediate the tower. The
tower modifications included: Reinforcing the legs from 0’ to 20’ and
replacement of all diagonal bracing from the 40’ to 80’ levels.
Galveston MW 100’ Self-Support Tower
for BNSF Railroad:
The tower failed under the requirements of EIA/TIA 222-G.
A PE certified engineering solution was designed to remediate the tower. The
tower modifications included: Addition of horizontal bracing from the 0’ to 60’
levels. A new tower foundation design was requisitioned due to the fact that
the tower had previously toppled over due to excessive winds created by
Hurricane Ike. The new foundation design was installed and incorporated a
larger footprint consisting of 40+ cubic yards of concrete and over 5,300 lbs of
reinforcing steel.
Dickworsham, TX 100’ Self
Support Tower
for BNSF Railroad:
The tower passed under the requirements of EIA/TIA
222-G. A PE certified engineering solution was designed to extend the tower by
adding two (2) twenty foot sections (40’ overall). The tower modifications
included: Adding tower sections above the 100’ level increasing the overall
tower to 140’.
7 Meter ETMS Pole
for BNSF Railroad:
Designed and fabricated twenty-three 7 Meter poles for
ETMS application in less than 3 weeks. Final product also included pre-cast
tower foundations.